BS EN 12350-1 PDF

1 Jan Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. , DAY RATE: Sampling/Slump/Making/Storage BS EN /BS EN /BS EN /BS EN · Concrete Cube Coring Drilling, POA. BS EN Testing fresh concrete. Sampling. standard by British- Adopted European Standard, 08/31/ View all product details. Most Recent.

Author: Sashakar Shaktizragore
Country: Jamaica
Language: English (Spanish)
Genre: Education
Published (Last): 16 March 2018
Pages: 115
PDF File Size: 7.28 Mb
ePub File Size: 12.10 Mb
ISBN: 731-4-83910-764-3
Downloads: 14189
Price: Free* [*Free Regsitration Required]
Uploader: Bazahn

Standards Subsctiption may be the perfect solution. Worldwide Standards We can source any standard from anywhere in the world. Apparatus Container, large enough to b at least 75 mm of concrete in all directions around the sensor of the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is greater.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

If the document is revised or amended, you will be notified by email. You may find similar items within these categories by selecting from the choices below:.

Sampling Concrete It is acceptable to measure the temperature in: The Location of concrete represented The Time of casting Compacting Methods Internal Vibrators that will be used should have the following specs: Concrete cubes at the site Marking The test specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling…. The Red document status indicator indicates that the document is an old version The document has likely been withdrawn by the publisher, also the meta data presented here may be out of date as it is no longer being maintained by the editorial teams at NBS.

TOP Related Posts  DA 3645-1 PDF

This document Older versions.

Raise the mold carefully in a vertical direction with no b or torsional motion Raise the mold in 2 to 5 sec. Usually, especially for big projects where a large quantity of concrete is cast, both parties come up with the designed mix and validated through trial mixes to compensates for this particular problem. Report from the sample includes: Compacting by hand with compacting rod or bar Distribute the strokes in a bw manner over the cross-section of the mould.

Leave a Reply Cancel reply Enter your comment here Do not remove the device from the concrete when reading the temperature.

Notify me of new comments via email. Subscription pricing is determined by: Again there may be more recent versions of the document.

We have no amendments or corrections for this standard.

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

To find out more, including how to control cookies, see here: I have a presentation subsequent week, and I am on the look for such info. Specifies two procedures for sampling fresh concrete: If a falling away or shearing occurs, disregard test and make a new test using another portion of the sample.

Compaction of the concrete The concrete shall be compacted immediately after placing in the moulds in such a way as to produce full compaction of the concrete with neither excessive segregation nor laitance. Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM projects.

TOP Related Posts  LUDOVICA SQUIRRU 2012 PDF

This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot sampling.

BS EN 12350-1:2009

It may be used to verify conformance to a specified requirement for the temperature of concrete. If the tamping operation of the top layer results in subsidence of the concrete below the top edge of the mould, add more concrete to keep an excess above the top of the mould at all times. The requirement for remixing the sample before tests on the fresh concrete, or before making test specimens, is included in the relevant standards.

The mold is raised and the concrete allowed to subside. Mechanical vibration with vibrating table Apply the vibration for the minimum duration necessary to achieve full compaction of the concrete.

This standard is also available to be included in Standards Subscriptions. Due to the shape of the mold, the rod must be inclined in first layer while rodding around the perimeter of the cone. Please download Chrome or Firefox or view our browser tips. Ej the temperature to the nearest 0. Full compaction is achieved using mechanical vibration, when there no further appearance of large air bubbles on the surface of the concrete and the surface becomes relatively smooth with a glazed appearance, without excessive segregation.